ANR-1175 AFO/CAFO REGISTRATION REQUIREMENTS: YOUR QUESTIONS ANSWERED
ANR-1175, New Feb 2000. Ted W. Tyson,
P.E., C.I.D., Extension Biosystems Engineer, Associate Professor,
Agricultural Engineering, Auburn University
AFO/CAFO
Registration Requirements:
Your Questions Answered |
It makes good sense and is good stewardship to protect the water we depend
on for animal and human use. Historically, farmers in Alabama have voluntarily
set protecting water quality as a high priority. Recently, the Alabama Department
of Environmental Management (ADEM) adopted an AFO compliance program and
a CAFO registration process, effective April 1, 1999, under the National
Pollutant Discharge Elimination System (NPDES) rules. NPDES rules require
that livestock feeding operations obtain required permits and control the
discharge of pollutants. This publication outlines the key facts you need
to know in order to:
1. Determine whether your livestock operation is required to register
2. Understand and comply with the registration requirements
What kind of livestock operation must be registered?
The short answer (yes, there is fine print to check out) is that you
must register if you are either of the following:
1. A concentrated animal feeding operation (CAFO) as defined according
mainly to the number and type of animals--more than 1,000 confined cattle,
2,500 swine, or 125,000 chickens
2. Any animal feeding operation (AFO) that has been designated
as a CAFO not by definition but due to a point source (end-of-pipe) or nonpoint
source (field runoff) discharge of pollutants after April 1, 1999
3. Any AFO not meeting or exceeding Natural Resources Conservation
Service (NRCS) technical standards and guidelines.
What is a discharge of pollutants?
The legal definition for discharge is the addition,
introduction, leaking, spilling, or emitting of any sewage, industrial waste,
pollutant, or other waste into the waters of the state.Waters of the
state means all waters of any river, stream, watercourse, pond,
lake, coastal, groundwater or surface water, wholly or partially within
the state, natural or artificial.
| NOTE: Because the regulation is often referred to simply as
a CAFO rule, a common misunderstanding is that only very large livestock
feeding operations would be subject to registration. You should be aware
that, under given circumstances, the requirements apply to relatively small
and even part-time operations. It is in the interest of all operators to
be aware of the registration requirements in order to take steps either
to be in compliance with or to avoid becoming unnecessarily subject to them. |
Is there a deadline for registration of a CAFO? What are
the consequences of not meeting the deadline?
The AFO/CAFO compliance and registration program was instituted as of
April 1, 1999, with a six-month period allowed (to September 30, 1999) for
CAFOs to file registration applications. CAFOs filing a satisfactory registration
application by that date were exempted from paying the base registration
fees. After September 30, any existing CAFO that continues operation or
any new CAFO that begins construction or operation without having filed
a satisfactory registration application can be considered in violation of
NPDES rules and federal and state Clean Water laws and subject to compliance/enforcement
and/or civil penalties.
What is an AFO, and how is it different from a CAFO?
An AFO (animal feeding operation) is any lot or facility where any
number of animals (need not be the same animals) have been, are, or
will be stabled, confined, gathered, or concentrated and fed or maintained
for a total of 45 days or more (need not be consecutive) in any 12-month
period (need not correspond to the calendar year), and the animal confinement
areas do not sustain crops, vegetation, forage growth, or post-harvest residues.
Two or more AFOs under common ownership are considered a single AFO and
may require registration as a CAFO if they adjoin or are in close proximity
to each other. Two or more AFOs under common or different ownership are
considered a single AFO and may require registration as a CAFO, separately
or together, if they are operated as a single operation, if they use a common
area or system for the disposal of wastes, if they significantly share resources,
storage or treatment systems, equipment, etc., or if they otherwise link
operations.
A defined CAFO is any AFO with more than a certain stipulated number
of animals. However, any AFO may be designated as a CAFO under certain
conditions and be required to register. The most important of these
to know about is having had a polluting discharge after April 1, 1999. AFOs
must meet the same waste management standards as CAFOs. They just don't
have to go through the formal registration process. Both have to implement
best management practices (BMPs) to be protective of water quality and maintain
records of how the waste was handled.
What do I have to do to meet registration requirements?
Registration is an annual application that must be approved before
a facility can legally begin construction or operation or continue operation.
To comply with the main registration requirements, you must
1. Complete a detailed Notice of Registration (NOR) with the assistance
of the Soil & Water Conservation District (SWCD) office.
2. Develop and file a comprehensive Waste Management System Plan (WMSP)
approved by NRCS and certified by a Qualified Credentialed Professional
(QCP).
3. Provide proof of a certain number of annual continuing education (CE)
credits in waste management or other approved topics.
4. Pay an annual fee, if charged. Base fees range from $50 to $525, depending
on the size of the operation. Consult your local SWCD office for more information.
As mentioned above, the base application fee was waived for first-time registrations
received by September 30, 1999.
Where do I get more information and help with registration,
if required?
Your local Soil & Water Conservation District (SWCD) office is the
official registration point. Every SWCD office has the NOR form and should
be the first place to contact. The Natural Resources Conservation Service
(NRCS) is often co-located with the SWCD and can offer assistance in completing
the NOR. You should also check with your county Extension office for assistance.
Your local Extension office will be glad to provide helpful information
and assist with obtaining and verifying continuing education credit.
If I don't have to register my AFO, do I have to meet
any other regulations?
YES. All AFOs must meet the same standards for nonpolluting waste management
as CAFOs, including having a Waste Management System Plan (not QCP-certified)
to implement BMPs protective of water quality, maintain records adequate
to document that they meet or exceed NRCS standards, and ensure their status
as "not a CAFO."
How do I go about developing a comprehensive Waste Management
System Plan (WMSP)?
To qualify for registration, a Qualified Credentialed Professional (QCP)
must certify the WMSP. It is not a simple do-it-yourself project. NRCS is
considered a QCP, so consult with them first. The WMSP must meet or exceed
standards set by NRCS.
Other QCPs recognized by ADEM include Alabama Professional Engineers
(PEs) experienced in animal waste management and (for nutrient management
plans only) Certified Crop Advisors (CCAs).
If I am registering for the first time, do I have to get
the CE credits first?
No. Initial registrants are allowed continuing education credits to be
certified within the first 12 months of operation. Generally, managing owners,
operators, and onsite supervisors are required to attend annual continuing
education sessions totaling up to 16 hours of approved group or individualized
training in the first year and up to 8 hours of refresher training in subsequent
years.
What happens if for some reason I don't get the CE credits?
If you don't satisfy the CE requirements, you must pay an additional
Greenfield fee of $500. Also, in this situation ADEM will prioritize your
facility for regular comprehensive and thorough inspection and evaluation
of the operation. The Greenfield fee supports ADEM's registration approval
and assurance effort.
What kind of information does the NOR form ask for?
The NOR asks for specific and detailed information about an animal feeding
operation. Since a CAFO cannot legally operate (or undergo any expansion
or major modification) unless an NOR is approved by ADEM, it is advisable
to do the best possible job of preparing the application. Some of the more
important kinds of information asked about are:
- Ownership, organizational structure, operator, and persons responsible
for handling the waste
- Violation history and any other permits or authorizations associated
with the operation
- Specifics on number and type of animals, structures, and waste management
plans and procedures, including attaching a 7.5-minute USGS map (or equivalent)
showing not only the AFO but surrounding potential receiving waters
- Listing of all registrant-owned, -leased, or -controlled land application
sites, including the latest dates and results of soil testing for each
such field. Important: Note that an AFO (or CAFO) can be held responsible
as a source of pollution not only at the AFO site but also when waste is
transported for land application elsewhere.
- Additional information (if available) that will assist timely review
and registration approval, such as: (1) the WMSP; (2) a detailed facility
map or drawing; (3) a soil map, flood map, or other maps; (4) aerial photographs;
(5) a list or maps of offsite land application areas; (6) buffer distance
documentation; (7) copies of soil tests; (8) copies of waste/wastewater
analyses; (9) copies of continuing education certificates/attendance; and
(10) inspection records.
What do all these abbreviations and terms stand for or
mean?
Animal waste -- bodily waste from livestock or poultry or a mixture
of waste with feed, bedding, litter, or other materials.
CAFO -- By the rule (simplified), a CAFO is an AFO with more than
the following number(s) and type(s) of animals: 1,000 confined slaughter
or feeder cattle; 700 mature dairy cattle (milked or dry); 2,500 swine (approximate
weight at least 55 pounds each); 500 horses; 10,000 sheep or lambs; 55,000
turkeys; 125,000 laying hens, broilers, or other poultry; 5,000 ducks or
1,000 animal units of any other type/size animal as determined by ADEM.
Any AFO having a polluting discharge after April 1, 1999, will also be classified
as a CAFO. (See above for definition of AFO and discharge.)
Natural Resources Conservation Service (NRCS) -- an agency of
the USDA that can provide assistance to operators in the design of a comprehensive
animal waste management system plan. The plan and its implementation must
meet or exceed NRCS standards and guidelines.
Nutrient Management Plan -- a comprehensive component of a WMSP
designed to account for all nutrients existing on, coming to, or leaving
a farming operation and to make efficient, nonpolluting use of these nutrients.
Professional Engineer (PE) -- a person qualified to practice engineering
according to the provisions of the Code of Alabama and presently
registered by the Alabama Board of Registration for Professional Engineers
and Land Surveyors.
Qualified Credentialed Professional (QCP) -- a qualified professional
who can document proven training and experience in design, implementation,
and inspection of comprehensive animal waste, waste product, and dead animal
disposal management practices and system plans.
Soil and Water Conservation District (SWCD) -- the local county
agency where an owner/operator goes to register any AFO/CAFO operation.
Waste Management System Plan (WMSP) -- a plan to properly collect,
store, treat, or land apply animal waste in an environmentally safe manner.
For registration purposes, this plan must be approved by a QCP to meet or
exceed NRCS standards and guidelines.
Certified Animal Waste Vendor (CAWV) -- a person certified by
the Alabama Department of Agriculture and Industries (ADAI) to accept liability
and responsibility on behalf of the farmer for proper transport and land
application of animal waste.
National Pollutant Discharge Elimination System (NPDES) -- the
permitting system for an individual owner/operator to obtain permit coverage
for the control of discharges of pollutant.
NOTE: This publication is intended and should be used as a general
guide to an interpretation of CAFO registration requirements, not as legal
advice or as in any way substituting for or contravening any official statements
or actual regulations on this subject.
This project was funded or partially funded by the Alabama Department
of Environmental Management |
For more information, contact your county Extension office. Look
in your telephone directory under your county's name to find the number.
For more information, contact your county Extension office. Visit http://www.aces.edu/counties or look in your telephone directory under your county's name to find contact information.
Issued in furtherance of Cooperative Extension work in agriculture and
home economics, Acts of May 8 and June 30, 1914, and other related
acts, in cooperation with the U.S. Department of Agriculture. The Alabama
Cooperative Extension System (Alabama A&M University and Auburn
University) offers educational programs, materials, and equal
opportunity employment to all people without regard to race, color,
national origin, religion, sex, age, veteran status, or disability.
|
If you have problems loading
this document, please email publications@aces.edu
for assistance.
Publications Homepage | ACES Homepage
|