| Comments | ||
| etridiazole | ||
| 10 ounces/cu. yd. media | Dry Soil Mix. Retreat as needed after 4 to 12 weeks with a fungicide drench. | |
| 6-8 lb./1,000 sq. ft. | Broadcast. See label for spreader settings. | |
| etridiazole + thiophanate-methyl | ||
| 6-12 ounces | Soil Drench: Apply with enough water to saturate soil or medium. Irrigate immediately. Retreat every 4 to 12 weeks. | |
| Dry Soil Mix. Retreat after 4 to 12 weeks with a recommended fungicide drench as needed. | ||
| fosethyl-AL | ||
| Soil Drench. Reapply every 30 days as needed. | ||
| Foliar Spray. Reapply every 30 days as needed. | ||
| Dry Soil Mix. Use only on well rooted plants. Treat as needed with a recommended fungicide after 30 days. | ||
| metalaxyl | ||
| 1-4 fluid ounces | Soil Drench. Apply every 2 to 3 months as needed. | |
| 2-5 fluid ounces | Soil Drench on Established Plants in Landscape. Broadcast or band with enough water to cover root zone. After application, irrigate with ½ inch water if rain does not occur within 7 days. | |
| 62-125 ounces | Broadcast. Covers 1000 sq. ft. of bed area. Repeat at 2 to 3 month intervals as needed. | |
| Dry Soil Mix or Incorporated.Thoroughly mix and irrigate with enough water to wet root zone. Retreat as needed after 2 to 3 months. | ||
| propamocarb | ||
| 25 fluid ounces | Soil Drench. Repeat at 3 to 4 month intervals. | |
| metalaxyl + thiophanate-methyl | ||
| 1 pkg. 3336 + 1 pkg. Subdue II |
At Seeding: Mix 1 gallon of stock solution per 100 gallons of drench solution. Agitate gently. Apply 0.5 to 1 pint of solution per square foot of bench or bed area at 21- to 28-day intervals as needed. | |
| 1.5 pkg. 3336 + 1 pkg. Subdue II | At Transplanting: Apply 1 to 2 pints of solution per square foot of bench or bed area and repeat at 21- to 28-day intervals as needed. Agitate gently. |